Projects What We Have Already Done

  • KOODAIDERI ENABLING BULK EARTHWORKS

    KOODAIDERI ENABLING BULK EARTHWORKS

    Client: Pindan
    Project: Bulk Earthworks Enabling
    Operator: Rio Tinto
    Location: Koodaideri
    Duration: Dec 2018 - Mar 2021

  • FULL RESEAL REPAIR OF CHANNAR ROAD

    FULL RESEAL REPAIR OF CHANNAR ROAD

    Client: Rio Tinto
    Project: Road and Civil Works, Parraburdoo Channar Rd
    Operator: Rio Tinto
    Location: Parraburdoo
    Duration: Sept 2018

  • CONSTRUCTION OF DREDGING BUNDS DMMA-C EAST

    CONSTRUCTION OF DREDGING BUNDS DMMA-C EAST

    Client: Hall Contracting
    Project: Lumsden Point Remediation Early Works
    Operator: Pilbara Ports Authority
    Location: Port Hedland
    Duration: Jan 2018 - Apr 2018

  • WHEATSTONE PIONEER CAMP REMOVAL

    WHEATSTONE PIONEER CAMP REMOVAL

    Client: Ross's Auctions
    Project: Wheatstone Project LNG Plant
    Operator: Chevron
    Location: Ashburton North
    Duration: Jul 2018 - Oct 2018

  • QUICK MUD CREEK BRIDGE

    QUICK MUD CREEK BRIDGE

    Client: McConnell Dowell
    Project: Wheatstone Project LNG Plant
    Operator: Chevron
    Location: Ashburton North
    Duration: Jan 2015 - Jun 2015

  • 1
  • 2
  • 3
  • 4

For more detail on any of our recent projects download our capability statement at the link below

NTC Contracting Capability Statement